Construction starts with site selection and alignment

Allow time to build up at the greenhouse

With a little manual skill the plant usually succeeds without major complications.It is even better when an assistant is available for the installation of wall elements and roofs. Nevertheless, you should plan the time for this work generously and consistently follow the enclosed assembly instructions. Of particular importance is the control of the integrity of all packaging, if possible in the presence of the forwarder, when delivering a finished complete set.

If building the greenhouse is done exactly, you usually do this work in one day. Installation becomes safer and less strenuous if an assistant is available and the assembly of the individual parts is exactly the same as the assembly instructions enclosed with the factory.

Best start in the morning

Depending on the size and features, the installation of the greenhouse parts can take a whole day. To make sure everything is set up until dark, you should start with the greenhouse construction right in the morning and if possible with no wind, The easiest way to assemble is to first unpack all the individual parts and place them in the same order as can be seen on the overall picture in the assembly instructions. At the same time, the completeness of the accessory material is checked before the start of final assembly.


Build tools for safe greenhouse

The first pages of the assembly instructions usually list all the necessary tools that are needed. If special keys are required, for example for the adjustment of windows and doors, these are often included ex works. Helpful for the individual assembly steps are:

Just work according to instructions and foundation plan

Especially when assembling the parts of the foundation all fasteners must fit millimeter exactly to each other, so that later fit the wall and gable parts and have a firm grip with each other. A detailed foundation plan is included in the assembly instructions. If not, these important documents are available for download from most manufacturers' online portals. After assembling the frame parts, this will be connected to the prepared foundation and should now be anchored firmly and without play.

The puzzle with wall elements and roofing

When covering, especially with glass, of course, special care must be taken to ensure that there is no accidental damage just before the target. If hollow-panel panels are installed in the greenhouse, the side equipped with UV protection must always face outwards. If the protective film has been removed, however, the coated side is no longer visually perceptible. If a corresponding imprint on the frame should be missing, it is best to additionally mark the right outside yourself, even at the door.


Tips

If all parts of the greenhouse are assembled according to the assembly instructions, it is better to leave the windows and doors open for a few more hours. The time should be used immediately to protect all seals at these openings in the interest of the longest possible life with a silicone-containing agent (according to the manufacturer) from wear.